References

Philips Global Technologie GmbH

  • Business relation since 1991
    CIRCLE as a production information system is a standard in the lighting production in Germany, Belgium, the Netherlands, France, Poland, China and Brazil

  • Philips mechanical engineering Aachen
    Construction performances, program performances, commissioning and installation of production lines in the lighting production

  • Rebuilding construction performances, program performances, commissioning and installation of Coating construction after European standard

  • Construction performances, program performances, commissioning and installation of a life span measuring place for 400 units, incl. date capture program for all measured values and binding to the host computer

  • 2010- Alignment System- installation of the aligment system to a porductmachine to aligment about 4 dimensions

Neumann & Esser AG- Übach- Palenberg
Neumann & Esser AG- Wurzen

  • Business relation since 2003
    Controlling units for compressor with binding to the local process control system in the following locations:

  • Project Mol Hungary
    Construction, production, delivery and commissioning of the electric-technical layouts and components to the control of the compressors for the natural gas support control system Modicon

  • Project ZAO China
    Construction, production, delivery and commissioning of the electric-technical layouts and components to the control in the petro chemistry

  • Project Choren in Freiberg, Germany
    Construction, production, delivery and commissioning of the electric-technical layouts and components to the control of the compressors for the biology-fuel production

  • Project UGS Trianel
    Compressor layout III + IV
    Constructions, delivery and commissioning of the electric-technical layouts and components to the control of a natural gas compressor

Trianel Gasspeichergesellschaft Epe GmbH

  • Business relation since 2007
    Delivery, installation and programming of the control for the initial filling of the gas storage cavern S54 over the compressor 3 incl. piping connecting including study to the process control system in the location of Epe

  • 2009- Delivery, installation and programming of the control for the initial filling of the gas storage cavern S41 including complete PC-S7 control project

  • 2010- Delivery, installation and programming of the PC-S7 control for the compressor 4 project

Creaton AG

  • Business relation since 1998
    Locations - Grossengottern, Autenried, Maisch
    CIRCLE gathering company product data. Capture by automatic countable places or hand-given dates (grade-errors, correction counter, quality data) evaluation CIRCLE, statistics and report production
  • 2009- Malsch
    CIRCLE gathering company product data. Capture by automatic countable places or hand-given dates (grade-errors, correction counter, quality data) evaluation CIRCLE, statistics and report production

Audi AG

  • Business relation since 2000
    Vehicle Transaction Platform
    Concept and development of a management platform of used cars for dealers of the group development
    AUDI/VW of vehicle stock exchanges for the public web site (new cars and second-hand cars) development of an internal sales platform for dealers of the group (on-line purchase of vehicles)
    Oracle database design and database development, SOAP-based web service applications, statistics and reporting tools

Moers GmbH

  • Business relation since 2008
    Textile machines and special machines
  • Delivery, installation and programming of the control for a cleaning layout for MTU Maintenance Hannover, a company of the MTU Aero engine
  • 2010- Programming of a control unit for textile coloring machine in baize factory- Aachen

Our TV-Spot

News

03.08.2011

MES System CIRCLE-acara

Our MES system - CIRCLE acara- receives new functionality and an improved layout. Currently, the order module goes into operation. Production orders, generated by the SAP system, are prepared and immediately become effective in the "Shop Floor System" CIRCLE.
Other features such as a product database (EDB = engineering data base) for the description of the product data; e.g. drawings, data sheets and limits; will be completed by the end of this year.

09.05.2011

Industry award 2011

Our company received the Industry Award of the district at the annual reception of the Mecklenburg-Strelitz on 05/07/2011. (more...)

24.02.2011

Quality-Management

As always at the beginning a year, we meet the certification according to ISO 9001:2008 by DQS. Our auditor, Dr. Nowack audits and reviewed us. Also important topic was the certification for the standard SCC.

22.02.2011

Our programming team is growing upt

We are delighted to welcome new project managers and programmers in our ranks. The Audi team receives staff from the local region and the island of Ruegen. Quality assurance is of particular importance and is professionally supported by a new employee.

18.02.2011

Assessment Date

Thanks to the professional support of the IT College Putbus. The college manages a very successful assessment center appointment. Thank you to everyone. Special thanks to all candidates who have accepted the challenge.

Logo-ITC

11.01. 2011

Device development

Our Michael Clausohm joined the scientific advisory board of the CP-Proteq GmbH. We will join forces in device development.

CP ProteQ

05.07.2010

CIRCLE

First installations of the new CIRCLE client "acara". These new platform independent components enables with a view over the CIRCLE recorded dates and offers automatic reports (Excel, PDF, HTML,...).

05.07.2010

AUDI

Our InMemory search engine had a redesign and is available in a new, user-friendly release. This ist the basic of used cars search in vehicle population of AUDI/VW.

02.07.2010

Trianel

Gas compressor 4 from the Trianel Gasspeicher Epe GmbH & Co.KG working fine. The test run is in full activity. Last works will finish the project.

22.03.2010

CIRCLE

We install the Production Information system CIRCLE in a factory in China. Our goal is to improve the quality of products highly significant.

27.02.2010

Neverin

ISO 9001:2008 and SCC certificates have been renewed with success..

25.02.2010

Grünes Licht in China

CAS- the new Alignment System from Clausohm has been installed with success in a Chinese production facility. Along with our CIRCLE system we conduce to great product quality improvement.

Jobs

Location: Ingolstadt, Berlin, Neverin

We are looking for a software developer with working knowledge in Java or HTML.

Please forward to us your application documents:

Download